915 floor bearing plate equipment
915 floor bearing plate equipment

915 floor bearing plate equipment

The steel floor bearing plate produced by the 915 floor bearing plate equipment has simple shape and large wavi...
Order

The steel floor bearing plate produced by the 915 floor bearing plate equipment has simple shape and large waviness. When it is installed, it is paved with welded reinforcement mesh and combined with concrete observation and pouring. It has good adhesion. In high-rise buildings, it can not only eliminate the steel formwork, but also reduce the floor load. It is proposed before reaching the same bearing capacity, so that the amount of steel used in the project is reduced, thereby saving investment

the steel floor produced by 915 floor bearing equipment is used for high-rise floor panels, which has the characteristics of high wave crest, good strength and good automation

915 floor bearing plate equipment operation and precautions:

1. Manual blank setting and blank taking procedures: before the equipment is used, check whether the connections are stable, whether the mounting bolts and nuts are tightened, and add enough lubricating oil in the left and right chassis before powering on and starting the machine for commissioning. First, operate the machine empty and carefully observe whether there is vibration, noise, oil coming from the oil window, and whether the movements of all components are coordinated, The mold can be installed only after it is normal. When installing the mold, cut off the power supply, manually move the motor belt or big gear to rotate the workbench and raise the sliding seat to the high point, so that an object can be supported between the workbench and the bottom surface of the sliding seat, so as to fall naturally and cause an accident

2. The mold needs an upper mold and six lower molds with the same specification and size. First, install the upper mold and a lower mold. The lower mold is directly installed on the hexagonal runner workbench, and the upper mold is installed on the bottom surface of the sliding seat, and place a base plate of appropriate thickness. After the upper and lower molds are closed, the gap around them is uniform, and the distance between the upper and lower molds is equal to the thickness of the required tile blank. Then, the upper mold shall prevail, the workbench shall be rotated, and the remaining five sets of lower molds shall be installed. After all the upper and lower molds are installed, the tile pressing can be started

3. Working procedures of automatic feeding and blank taking: the mold installation and main machine commissioning are the same as the above, and then start the air compressor, vacuum pump, extruder, tile cutter, feeding machine, tile press, main machine and tile conveyor. When stopping, stop the extruder first, and then stop other equipment